Projects

USIC solutions for oil and gas production are not only modern drilling rigs and equipment of own production, but also a full range of services for design and delivery, turnkey installation of facilities and further service maintenance.

Drilling rig
USPK BU-400 EKA TAIMYR-01

  • 2021
  • Customer: OOO Vostok Oil
  • Location: Taimyr Peninsula, Zapadno-Irkinsky license area
  • Number of sets: 5

About project

Manufactured, in the process of delivery.
Complex supply – engineering, manufacturing, supervision, installation, commissioning, start-up.

Drilling rig
BU USPK 6000/400 ERA TAIMYR-R1

  • 2020 – 2021
  • Customer: Rosgeologiya JSC
  • Location: Krasnoyarsk Territory, Kanandinskaya well, 278
  • Number of sets: 1

About project

Complex supply – engineering, manufacturing, delivery, supervision, installation, commissioning, start-up.

The peculiarity of the project is complicated logistics. At the beginning of 2021, the drilling rig was delivered from Yekaterinburg to Ust-Ilimsk, Irkutsk Region. From here a 1,466 km winter road was built to the drilling site. The following products were delivered to the drilling site along the winter road: a drilling rig with the weight of 1600 tons, 750 tons of fuel and lubricants. A total of 3,600 tons of materials and equipment were delivered.

Drilling rig
BU USPK 6000/400 ERA TAIMYR-R1

  • 2020
  • Customer: OOO TaimyrburService (OOO TBS)
  • Location: Dudinka, Irkinskoye field
  • Number of sets: 2

About project

Complex supply – engineering, manufacturing, delivery, installation supervision, start-up and adjustment works, commissioning.

Drilling rig
USPK BU-320 EK

  • 2018 – 2020
  • Customer: OOO Baikitskaya oil and gas surveying expedition (OOO BNGRE)
  • Location: Krasnoyarsk Territory, Kuyumbinskoye field
  • Number of sets: 6

About project

Complex supply – engineering, manufacturing, supervision, installation, commissioning, start-up.

Drilling rig
USPK BU-400 EKA TAIMYR-01

  • 2018 – 2019
  • Customer: OOO TaimyrburService (OOO TBS)
  • Location: Dudinka, Irkinskoye field
  • Number of sets: 1

About project

Complex supply – engineering, manufacturing, supervision, installation, start-up and adjustment works, commissioning.

Drilling rig
USPK BU-320 EK

  • 2016 – 2017
  • Customer: OOO BURING SERVICE TECHNOLOGIES (OOO BST)
  • Location: Khanty-Mansiysk, Kondinskoye field
  • Number of sets: 8

About project

Complex supply – engineering, manufacturing, supervision, installation, commissioning, start-up, support during the trial period.

Drilling rig
USPK BU-320 EK

  • 2015
  • Customer: OOO Targin Drilling
  • Location: Muravlenko, Yuzhno-Purpeyskoye oil field
  • Number of sets: 1

About project

Complex supply – engineering, manufacturing, installation supervision, commissioning.

Drilling rigs modernisation
Uralmash 3000 EUK, Uralmash 3000 EUK-1M

  • 2013 – 2015
  • Customers:
    • OOO Targin Drilling – 6 sets
    • ZAO Siberian Service Company (ZAO SSK) – 4 sets
  • Object addresses:
    • Nizhnevartovsk city, Samotlor field
    • Noyabrsk city, Novogodneye field
    • Muravlenko city, Krayneye Field
    • Nefteyugansk city, Prirazlomnoye field
    • Strezhevoy city, Archinskoye and Yuzhno-Shinginskoye fields

About the project

Development of technical documentation, replacement of derrick-winch block and increase of drilling rig capacity from 200 to 250 tons, complete replacement of all control circuits, rails, drilling monitoring and control systems, supervision, commissioning.

Drilling rig
USPK BU-320 EK

  • 2012
  • Customer: OOO NSH ASIA DRILLING
  • Location: Berezniki, Yuzhno-Yurchukskoe field
  • Number of sets: 8

About the project

Engineering, manufacturing, supervision installation and commissioning works.